Posts

Remediation within a thermoelectric power plant

Within an operating thermoelectric power plant, we carried out soil remediation using Dig&Dump technology in the area where a large-diameter above-ground tank had been located. The activities included the construction of storage bays, the removal of interfering above-ground structures, and the demolition of the concrete containment structures of the tank.

Leave a Reply :